Factory-direct export logistics for furniture mechanism orders — lead times, documentation, packaging, and order process.
The content on this page is provided for general informational purposes and does not constitute legal advice. Shipping terms, customs requirements, and trade regulations vary by destination market and change over time. We strongly recommend confirming current requirements with your freight forwarder and customs broker before placing an order.
For catalog mechanisms — chair tilt, recliner linkages, sofa bed frames, lift-top fittings, hinge systems — standard production lead time is 25–35 days from order confirmation and deposit receipt. That window covers the full production run: material staging, stamping, welding, surface treatment, assembly, 100% functional testing, and export packing.
OEM and ODM projects with new tooling run on a separate schedule. We don't give a single delivery date for tooling projects — we give you a milestone breakdown:
Each milestone is a real checkpoint, not a buffer we padded to protect ourselves.
The most common source of delay we see: buyers sending revised specifications after production has started. Lock your artwork, dimensions, and finish spec before order confirmation. A spec change mid-run costs time for both sides.
We export factory-direct to five regions. No trading company in the chain — your order is quoted, produced, inspected, and packed here, and the export documentation comes from the same team that managed your production run.
CE declaration of conformity and SGS test reports ship with the order. Documentation handled without you having to brief us.
Material and compliance documentation their customs brokers need for HTS classification — provided as standard.
Coordinated with certificate of origin and any destination-specific requirements your freight forwarder flags.
Packaging is engineered for 40HQ container loading, not designed around what's convenient on the assembly line. Carton dimensions for the main product lines are sized and stacked to the pallet configurations that maximize cubic utilization in a standard container — your freight forwarder isn't improvising at the warehouse.
For buyers who need retail-ready packaging or branded cartons with your logo and product information, that's handled as part of the OEM arrangement. We run branded packaging regularly; it doesn't add lead time if the artwork is confirmed before production starts.
Flat-pack and KD configurations are available on select mechanisms where the geometry allows it. If landed freight cost is a constraint for your market, ask us about KD options when you request a quote.
CE declaration of conformity and SGS audit reports ship with the order. For buyers supplying into RoHS-regulated markets (EU, California), trivalent chromium passivation documentation for the zinc plating process is available with shipment.
If your customs broker or compliance team needs additional documentation — material certifications, mill reports, specific test standards — flag it before production closes. Chasing documents after the container ships is a problem we'd rather both avoid.
At our 3,000,000-unit annual capacity across 6 dedicated production lines, a 500-unit order and a 50,000-unit order both get scheduled and shipped — the difference is in how we stage the production run, not whether we take the order.
Line separation by product category means your chair mechanism order doesn't queue behind a large sofa bed run.
For buyers who need consistent supply across multiple shipments, we support blanket order arrangements. You commit to a total annual volume; we schedule production in releases that match your inventory cycle. That structure gives you:
Submit your RFQ via the contact form or email. Include mechanism type, quantity, destination port, and any OEM requirements.
We return a detailed quotation: unit price, tooling cost if applicable, packaging spec, lead time, and FOB port of loading.
Confirm the order and remit the deposit. Production is scheduled from deposit receipt — not from PI issuance.
Production runs with milestone updates. Pre-shipment inspection report issued before balance payment is requested.
Balance payment received, container loaded and sealed. Full document set couriered or sent electronically within 3 working days of vessel departure.
The more complete your RFQ, the faster we can return an accurate quotation. Useful information to include:
Standard payment structure is T/T 30% deposit against PI, balance before shipment. For established accounts with order history, we discuss extended terms on a case-by-case basis. We do not offer open account terms to first-time buyers.
Submit your mechanism type, quantity, and destination — we'll return a detailed quotation with unit price, lead time, and FOB terms.